- This test performs 5 distinct operations on the RT code base. Each phase
- writes a log file where errors can be found if the execution stops.
- Step 1: Build
- This step makes sure that there aren't compilation errors nor warnings in all
- the defined configurations.
- Step 2: Execute
- The test suite is executed in the simulator in order to make sure that all
- the defined test cases succeed in all the defined configurations.
- Coverage data is collected during the execution for use by step 3.
- Step 3: Coverage
- The utility gcov is ran on the generate data and the coverage information is
- stored in reports under ./reports.
- Step 4: Analysis
- PC-Lint is run on the codebase in order to detect MISRA violations or other
- problems under the current analyser rules set (PC-Lint 9.0L is required).
- Step 5: Clearing
- The compilation products are cleared and the system is restored to original
- state except for the generated reports and logs.
|